228 results

  • Sacramento Capitol Annex Skylights

    This article documents the development or the design of two skylights on the Sacramento Capitol Annex Project throughout Design Assist and sheds…
  • Blast Performance

    Designing for blast performance for glazing units can be very complex. The test methods for evaluating performance include subjecting units to actual

  • Building by Numbers

    This paper outlines the successful implementation of digital workflows between the design team composed of Architect, Structural Engineer and Project

  • Deconstructing the Window

    Over the years, the industry has relied heavily on the increasing performance of low-e coatings to drive window U-factors (thermal transmittance)

  • Hybrid Timber

    This case study provides an overview of building hybrid curtain wall system and future opportunities for the use of timber. It will also review the

  • The Thermal Blanket Concept

    This paper tells the story of a Double Skin Facade (DSF), where high performance and multi-disciplinary collaboration saves a library concept of

  • Addressing Embodied Carbon

    Reducing greenhouse gas emissions from the building sector is critical to limiting global temperature rise to less than 1.5⁰C. Construction and

  • Attention to Overheating in Curtainwall Buildings

    Several years ago, Technoform and the Solar Energy Research Institute of Singapore (SERIS) researched the thermal performance of different aluminum

  • Form as Energy

    All too often, high-performance building envelopes are considered in terms of new materials and technologies that push specific systems to improve

  • Towards Net Zero Enclosures

    As architects and designers we understand the urgency of addressing the building sector’s role in the ongoing environmental crisis. Architecture2030

  • Edge Lighting Glazing with Hidden Fixtures

    Dynamic architectural lighting in urban areas is a key element in creating attractive nighttime icons in addition to potentially generating

  • FTI DIALOGUES: Pushing Change

    Pushing Change: R&D Innovation Processes in Construction Building Products, the second installment of the FTI Dialogues: Suppliers & Contractors Series, took place virtually on Friday, March 26th.